██████████                                 █████████
░░███░░░░███                               ███░░░░░███
 ░███   ░░███  ██████   ██████  ████████  ███     ░░░   ██████
 ░███    ░███ ███░░███ ███░░███░░███░░███░███          ███░░███
 ░███    ░███░███████ ░███████  ░███ ░███░███         ░███ ░███
 ░███    ███ ░███░░░  ░███░░░   ░███ ░███░░███     ███░███ ░███
 ██████████  ░░██████ ░░██████  ░███████  ░░█████████ ░░██████
░░░░░░░░░░    ░░░░░░   ░░░░░░   ░███░░░    ░░░░░░░░░   ░░░░░░
                                ░███
                                █████
                               ░░░░░
DEEPCO™ SYSTEM UPDATE LOG

REVISION ARCHIVE

Transparent, traceable, and occasionally ominous. Browse every published system adjustment by corporate decree.

[<-] Back to Frontpage
Entries Published
79
since launch
Last Revision
Dec 05, 2025
auto recalculated
[Feature]Rev#81 Dec 05, 2025 — 16:23

Operator Feedback Channel

Applied

DeepCo™ is introducing a new feedback channel for Operators. You can now submit feedback directly through the chat interface.
- What This Means for You
This channel streamlines feedback collection and supports our continuous improvement optimization. Your input helps us refine operational efficiency and enhance the Project Rosetta workflow.
- How It Works
Access the feedback channel from your operator terminal
Submit feedback at any time during your shift
All submissions are automatically logged and routed to the appropriate department
DeepCo™: Optimizing reality, one feedback at a time.

[Feature]Rev#80 Nov 20, 2025 — 19:19

Processing Range Optimization Warnings

Applied

Implemented proactive efficiency zone monitoring to prevent accidental performance degradation
- Operators now receive warnings before purchasing DC upgrades that would push their Processing Rating beyond the normal efficiency range for their department
- Auto-upgrade system automatically pauses before exceeding optimal efficiency thresholds, requiring explicit confirmation to proceed
- Prevents operators from inadvertently entering decay or penalty zones where reward multipliers decrease
- Manual upgrade purchases display confirmation dialogs when upgrades would exceed department-normalized processing power limits

DeepCo™ — Efficiency zone compliance protocols activated. Stay optimal. Stay productive. Stay within parameters.

[Feature]Rev#79 Nov 19, 2025 — 11:31

Performance Rating Optimization

Applied

Performance metrics now exclude intern-level Operators. Their contribution patterns do not meet the minimum threshold for meaningful evaluation. This optimization improves metric accuracy and reduces system noise.
Only Operators who have demonstrated sufficient engagement with DeepCo™'s core operations will be included in performance ratings. This refinement ensures our evaluation systems reflect the high standards that have made DeepCo™ a leader in operational excellence.
DeepCo™ continues to optimize every aspect of our operations. This update represents another step forward in our commitment to precision, efficiency, and data-driven excellence.

[Feature]Rev#78 Nov 09, 2025 — 12:50

Overclock events and performance

Applied

Overclock Events
- Overclock events are now a bit more noticeable — the spinner briefly increases in size to draw attention when triggered.

Operator Activity Requirement
- Operators must now have logged in within the past 7 days to appear in the performance overview.

FAQ Removal
- The FAQ for processing logs has been temporarily removed.
This feature isn’t currently part of DeepCo™ but may return later in another form.

[Feature]Rev#77 Nov 01, 2025 — 09:21

Presence log

Applied

DeepCo™ now tracks and displays operators online time. We show and monitor this data on 3 axis, daily, weekly and lifetime.
the metrics can be seen on the operators dossier as well as the online operators tab.

Your time belongs where it matters most — with DeepCo™. Stay connected. Stay productive. Stay valuable.